AccuRender nXt

advanced rendering for AutoCAD

Hi all. I think that another usefull improvement of nXt could be the possibility to set up the rendering time and/or time to start and time to end. This is now possible only by using the farm, although the only parametre to end the rendering process is the # of passes. Rather than number of passes, I often prefer to launch a render nightime, but I want to be able to use the machine again in the next morning. For this, it is impossible to guess the passes!

Views: 147

Reply to This

Replies to This Discussion

Time constraints for the Batch processor would be pretty easy, with or without the farm.  For single-frame farm images time constraints will only work with the hybrid and path tracer engines.  What's your specific application?

Hi Roy, thanks for answering. What I would like to do is to be able to seti the time for a render to start/end and/or the duration. Don't know if in a single render or in a batch process (sometimes this is better... don't know). Let's say: render A will start at 8 pm of the day X and will end at 8 am of the day X+3 (or: start at 8pm of the 2103.01.15 and will end at 8am of the 2013.01.17). Or render B will start at 8pm of the day Y and will last 72 hours. In these cases, no matter how many passes, because they can be summed into the image editor, but YES I will have the machine ready to work at a certain time in the morning.

If you're just talking about a single rendering running in the interactive product, why can't you just stop it when you get to work in the morning?

This other stuff could work easily for the farm.  Specifying a start time will definitely be render farm only-- that's already there.  Specifying a duration can be done for the type of jobs mentioned above. (If you want to have a single machine work on a single frame for a specified time you can start a batch farm job with one task.)  If you want to have multiple machines work on a rendering for a set time you'll need to use the Path Tracer or Hybrid engines.

I can also add a duration to the general Batch processor.

Mmmm... you're right! I've never thought to start a farm job with just one machine. Anyway, duration of the job would be apreciated. Thanks Roy.

RSS

Search

Translate

Latest Activity

Maciej posted photos
Tuesday
N` Goraw replied to N` Goraw's discussion ACCURENDER NXT FOR WALKTHROUGHS
"thank you a lot for this"
Apr 12
Tom Jarvi posted photos
Mar 12
OYEBANJI EMMANUEL posted a photo

Render 1 copy (1)

This is a remake of one of Peter Milner's scenes. I dont have the file. I photo-matched it in sketchup and rendered in nxt render for autocad.I just retouched it and increased the resolution.
Dec 20, 2023
OYEBANJI EMMANUEL posted a photo

Render 1

This is a remake of one of Peter Milner's renders.I dont have the file. I photo-matched the scene in sketchup and rendered with nxt render in autocad.I replicated it.
Dec 18, 2023
OYEBANJI EMMANUEL posted a photo

00001 copy

An office render i did recently.Critics and comments are welcome.Its one of the frames of a walkthrough animation i did recently.I used sketchup to model, exported to autocad and rendered with nxt render.
Nov 22, 2023
OYEBANJI EMMANUEL posted a discussion

nxt render Course/tutorial

Good day Sir,I want to know the number of people that would be interested in a nxt render course because i plan to create one.Please send me a prompt reply if you are interested.Just sayHi am in.Checkout a walkthrough i just created recently with nxt render for autocad after modelling in sketchup and then post-producing in photoshop.…See More
Nov 5, 2023
OYEBANJI EMMANUEL replied to N` Goraw's discussion ACCURENDER NXT FOR WALKTHROUGHS
"Good day Sir, Hope this message meets you well. I just completed a short walkthrough of an office. Its down here https://drive.google.com/file/d/1L4p5Iyiq5MiSK137UT1eH3POuiI5ZLDA/view?usp=drive_link"
Nov 5, 2023

© 2024   Header image courtesy Peter Milner   Powered by

Badges  |  Report an Issue  |  Terms of Service